← radar
HYUNDAI — funding rate on Bybit
Bybit · HYUNDAIUSDT+0.062%per 8h · +0.008%/hshorts receive
last settlement0.000%→upcoming payout+0.062%▲ heating up
7:43:29settlement
0calmheat
Price (mark)
253.55
-7.0% 24h
Vol 24h
$165K
Open interest
$196K
Price move in 2 min
—
avg 7d
0.000%/h
avg 30d
+0.002%/h
Entry economics
Position calculator
- Position size
- $2,500
- Funding per settlement (8h)
- $1.56 · $0.19/hour
- Net snipe per settlement
- $-2.44 = 0.062% − 0.110% − 0.050%
- Break-even for entry
- rate covers the threshold 0.39×needs 0.160%+ per settlement
- Liquidation price
- 302.9923 (+19.50% from price)
- Risk at this leverage
- no volatility data
- Max “green” leverage
- —
Funding goes to whoever holds the position at the cut-off. MMR in the liquidation formula is +0.50%; verify the price on the exchange before trading.
Context and comparison
Funding history · 163 settlements
avg 7d 0.000%/havg 30d +0.002%/h
HYUNDAI on 4 exchanges
| Exchange | Rate | Per hour | Receives | Snipe |
|---|---|---|---|---|
| Bitget | +0.089% / 4h | +0.022%/h | shorts | -0.071% |
| Binance | +0.055% / 4h | +0.014%/h | shorts | -0.105% |
| Bybit ← you are here | +0.062% / 8h | +0.008%/h | shorts | -0.098% |
| OKX | +0.050% / 8h | +0.006%/h | shorts | -0.110% |
Bitget+0.022%/h
shortsrate +0.089% / 4hsnipe -0.071%
Binance+0.014%/h
shortsrate +0.055% / 4hsnipe -0.105%
Bybit← you are here+0.008%/h
shortsrate +0.062% / 8hsnipe -0.098%
OKX+0.006%/h
shortsrate +0.050% / 8hsnipe -0.110%
Max spread across exchanges: +0.016%/h
Rates across exchangesPRO · open for now
4 exchanges on one timeline
Bybitevery 8hBitgetevery 4hOKXevery 8hBinanceevery 4hrate corridor between exchanges
exchanges settle at different frequencies — an 8-hour step is bound to «lag» a 1-hour one, that's its grid, not a slower market
spread typically
0.0000%/h
widest spread
0.0162%/h
27.07 01:00 · Bitget ↔ Bybit
the spread is the hedge's rate before fees: that's what an hour of the pair-trade yields
How to read this
- Snipe: enter short before the cut-off, exit after settlement. Funding goes to whoever holds the position at the cut-off. The net capture in the calculator is already net of fees and slippage — and it does not include price moving against you in the settlement window (see volatility above).
- Hedged: a short here + an opposite position of the same size on another exchange or spot — funding capture without price risk, but four legs of fees.
- Extreme funding is a crowd story: price often runs into the cut-off and reverses after. This is data for a decision, not a recommendation.