FUNDING RADARruen
← radar

ORDER — funding rate on OKX

OKX · ORDER-USDT-SWAP
+0.005%per 4h · +0.001%/hshorts receive
last settlement+0.005%upcoming payout+0.005% unchanged
33:15settlement
0calmheat
Price (mark)
0.02805
-4.7% 24h
Vol 24h
$187K
Open interest
$162K
Price move in 2 min

Entry economics

Position calculator
Position size
$2,500
Funding per settlement (4h)
$0.13 · $0.03/hour
Net snipe per settlement
$-3.88 = 0.005%0.110% 0.050%
Break-even for entry
rate covers the threshold 0.03×needs 0.160%+ per settlement
Liquidation price
0.03352 (+19.50% from price)
Risk at this leverage
no volatility data
Max “green” leverage

Funding goes to whoever holds the position at the cut-off. MMR in the liquidation formula is +0.50%; verify the price on the exchange before trading.

Settlement window · facts (2)
before cut-off · 15m
avg-1.50%
max-1.71%
after · 15m
avg+1.00%
max+1.20%
Cut-offRateBeforeAfter
24.07 16:00-0.160%-1.71%+1.20%
24.07 12:00-0.881%-1.30%+0.79%

Context and comparison

Funding history · 545 settlements
avg 7d -0.007%/havg 30d -0.001%/h
ORDER on 4 exchanges

Max spread across exchanges: +0.005%/h

Rates across exchangesPRO · open for now

4 exchanges on one timeline

OKXevery 4hBybitevery 8hBitgetevery 4hBinanceevery 4hrate corridor between exchanges

exchanges settle at different frequencies — an 8-hour step is bound to «lag» a 1-hour one, that's its grid, not a slower market

spread typically
0.0000%/h
widest spread
0.127%/h
24.07 09:00 · Bybit ↔ Bitget

the spread is the hedge's rate before fees: that's what an hour of the pair-trade yields

How to read this
  • Snipe: enter short before the cut-off, exit after settlement. Funding goes to whoever holds the position at the cut-off. The net capture in the calculator is already net of fees and slippage — and it does not include price moving against you in the settlement window (see volatility above).
  • Hedged: a short here + an opposite position of the same size on another exchange or spot — funding capture without price risk, but four legs of fees.
  • Extreme funding is a crowd story: price often runs into the cut-off and reverses after. This is data for a decision, not a recommendation.